SuperDeck | Lubeca Technology

SuperDeck

superdeck

SuperDeck, has been the preferred choice on construction projects around the world for almost two decades. Designed to simplify the handling of materials, particularly on multi-storey construction sites, this revolutionary Preston Hire innovation offers a ‘drawer-like’ loading platform system which has dramatically increased safety and reduced crane operation time for customers across the globe.

 


 

SuperDeck loading platforms are fitted with fixed safety harness points to allow units to be vertically stacked and rolled in and out as required – as opposed to being staggered in the traditional deck configuration – which increases the efficiency of materials handling by minimising hindrance to crane ropes and loads for faster, safer and more cost-effective crane operation.

 

Extending from 4.5m to 5.25m out from the side of a building, SuperDecks can be extended or retracted by one person and are rated for a universally safe working load of 5 tonnes. They also offer quicker installation and relocation times of approximately 15 minutes, compared to over one hour for conventional loading decks.